Showing posts with label Summer Break 2014. Show all posts
Showing posts with label Summer Break 2014. Show all posts

Monday, June 30, 2014

Summer Break 2014 Week 3

Well I made progress this week.

I worked in the yards: It really doesn't take much to fill up all the trash cans around here. :)

SB Week304

My cutting table went from this:

[caption id="attachment_2768" align="aligncenter" width="300"]Cutting table before Cutting table before[/caption]

 

To this on Monday, and really you can still see the surface today too.

[caption id="attachment_2769" align="aligncenter" width="300"]Cutting Table After Cutting Table After[/caption]

I tackled my "Mountain of Flannel"  now it is mostly contained in these bins.

[caption id="attachment_2761" align="aligncenter" width="225"]Mountain of Flannel Mountain of Flannel[/caption]

I finished up my String Star Centers and even trimmed up several to start my star block.  Yes I was doing it at the kitchen counter and yes I grabbed a bowl out of the cupboard above for the scraps. :)

[gallery ids="2774,2772"]

Also finished up some furniture.  How about this lovely little shin warmer chair. Is she cute or what.  While I was on the furniture roll I finished up this little storage footstool too.

[gallery ids="2779,2778,2775,2777,2776"]

I received some 2" charms from Deanna at Wedding Dress Blue for my 2-inch quilt which is her pattern Growing up Odd.  Still totally in love with this pattern and can't wait until fall when I have it all together.  I've fallen behind on my one block a day goal but made up many when I received her charms.  I just had to use them right away. Of course

[gallery ids="2770,2773"]

I'm cutting squares and sewing blocks as I work through my scrap bins

Here is my block count for my three summer projects

3" 9-Patches :  Have 247  Need about 400 I think

2" Quilt:  Have: 54   Need 17 to be caught up to July 1st

2.5" Plus quilt:  Have 184 sets of 5 cut  Need 97 more sets for a total of 281

2.5" Plus quilt: Have 10 sets of 4 cut.  Need 21 more sets for a total of 31

Monday, June 23, 2014

Summer Break Week 2

Week two of summer break and no finishes sure hope it won't be like this all summer.  So just what did get worked on this week?

There was some painting. I changed color in mid painting of the chairs and this is the vintage fabric I'm using on the seats.

[gallery ids="2738,2739,2740,2741,2742"]

We welcomed a new old sewing machine to the fold.  She came with her own cabinet. A singer 201

[gallery ids="2747,2749"]

We did some cleaning out, yes this part of the house still has original 1960's avocado green carpet. This is not the permanent home for the new machine.

SB Week2 1a

I started in on the guest room.  Can you believe there were still Halloween and Christmas pillowcases and table runners on the bed from last fall.  It's no wonder we don't get many guest. I think they're afraid they'll have to sleep on the floor for all the fabric on the bed.  Not really Sister, you can come anytime.

SB Week2 13

Mr Bill took apart an old pump organ.  Before you feel too bad it was in really bad shape and we saved the good pieces and carved pieces to repurpose.

[gallery columns="2" ids="2743,2744,2745,2746"]

Tuesday was QOV sew day.  We were making string blocks ala Al Lind.  I have a few many to go for my quilt top.  But I sure do like string quilts.  Here is the link to the pattern on the Quilts Of Valor site

This summer I'm trying to get the sewing room back in order and get all the donated scraps under control. Some times I have a hard time cutting up the larger scraps, cause wonder if I need a 4 inch block and I cut it all down to 2.5 in.  Really sometimes I can drive myself crazy.  Well not this summer it's all getting cut down to usable sizes and this fall I'll have a empty "scraps to cut down" bin (or two).

So with that in mind I'm cutting 2.5 in and 1.5 in squares in sets of five.  The 2.5 in for a plus quilt that I'm starting in the fall, as of this morning I only need 100 more sets, no matching sets for this one.  The 1.5in is for nine patch blocks I started last July as my leader/ender and I'm ready to finish it up too....But I need lots more for the layout I'm thinking so it has moved from leader/ender to summer project.

[caption id="attachment_2751" align="aligncenter" width="300"]Sweet little 9 patches that will finish at 3in Sweet little 9 patches that will finish at 3in[/caption]

Then there is the 2in quilt.  The one I was going to make one block a day quilt.  Well I'm only 13 days behind.  I'm thinking Wednesday night will be 2in nine patch marathon so I can get a few days ahead. I wrote about it here.

[caption id="attachment_2752" align="aligncenter" width="300"]2 in quilt 2 in quilt[/caption]

So that is how Week 2 went. Not so exciting yet but there's always hope.

Till next week.

 

 

 

Monday, June 16, 2014

Summer Break 2014 Week 1

And just what did I get checked off my impossible long list.  Well not a gosh darn thing.  I've started on things but no finishes for the first week.

First there was the furniture.  Doing the prep work always takes the longest

[gallery ids="2719,2720,2721,2724,2725"]

I did make a cover for Mr. Bills computer while getting acquainted with my new featherweight.

SB Week1 04

The dirt piles that have been showing up got moved and spread around.  Mr. Bill got to do his favorite job of "water boy "  and look there was a bonus in the piles of dirt.  Big granite rocks, we like big rocks here.

[gallery ids="2726,2727,2728,2729,2730"]

Then I pulled this quilt top out of cold storage..well you know what I mean. You might remember that it was just last summer that I was finishing it up.  I really was not happy with the way it turned out so it got put away to rest.  I think I'm ready to try again to get this one off the UFO list.

[caption id="attachment_2723" align="aligncenter" width="225"]Charm Quilt Top Charm Quilt Top[/caption]

Time was also spent cutting up scraps, eye appointments and trips looking for paint and to Home Depot.

I did some cleaning too and found the top of my buffet.  Now that impressed Mr. Bill.

[caption id="attachment_2731" align="aligncenter" width="300"]Buffet Buffet[/caption]

Not too bad for the first week of summer after all I don't want to get it all done in one week.  :)