Showing posts with label charm quilt. Show all posts
Showing posts with label charm quilt. Show all posts

Thursday, February 27, 2014

LYOF February UFO Finished

February's UFO is finished.  It was a close finish right down to the wire.  With other commitments and some travel I wanted to chose wisely and it was still close.  Here is my February  Goal Post 

I started with charm squares sewn together, also in the bag were some extra 5 in squares and two rows of charms already sewn together. Looks like I took them off the quilt for some reason.  The two rows were reattached and borders made.

[caption id="attachment_2527" align="aligncenter" width="300"]Making borders Making borders[/caption]

Ready for the quilting part I went in search of backing and batting.  Score found both in the stash!

[caption id="attachment_2528" align="aligncenter" width="300"]Layered and ready Layered and ready[/caption]

Wednesday evening was my time to get this sweet thing done.  With some wavy line quilting, which is about the current extent of my abilities this little baby quilt came together.

[caption id="attachment_2529" align="aligncenter" width="300"]Feb UFO Done Feb UFO Done[/caption]

It doesn't have a destination yet but it is ready to go when needed and it's a big  check mark on my UFO list

[caption id="attachment_2530" align="aligncenter" width="300"]Baby Flannel Charm Quilt Baby Flannel Charm Quilt[/caption]

Thanks to Shanna and Melissa for hosting A Lovely Year Of Finishes another one is done.  Head on over and check out all the wonderful finishes this month.

Monday, August 12, 2013

Design Wall Monday August 13, 2013

It's Monday again and time to check out the progress on my tumbler charm quilt.  In spite if several distractions I was able to make progress on the charm quilt this week.

I decided on a border color and all the charms were cut.  Saturday late afternoon I was able to start on the last 13 rows and finished them up by Sunday afternoon.  I now have 37 rows of 27 mini tumbler charms.  Now I need to sew a grey tumbler on each end of each row and then sew two rows of grey for the top and bottom border.

[caption id="attachment_2244" align="aligncenter" width="225"]Mini Tumbler Charm Mini Tumbler Charm[/caption]

Of course this is the week that the both sewing machines have appointments at the sewing machine spa.  I've so very lucky that my new sewing machine shop makes appointments so I don't have the two to three week wait time that I use to have.  I plan to use the down time this week to clean up the sewing room that looks like  a fabric tornado came through.

[caption id="attachment_2243" align="aligncenter" width="300"]Bonus. Used up 10 of these Bonus. Used up 10 of these[/caption]

I'll need to go through the closet for a backing and then I'm thinking about how I want to quilt it.  Did I mention that it has to be done, as in completely done by Sept 5th.  Yikes and no machine time until Friday or Saturday.

I'm linking up with Judy at Patchwork Times for Design Wall Monday,

Thursday, August 1, 2013

Setting August Goals

It's time to set my August Goals.  I've been very lax about keeping track of my goals for several months.  I end up with many lists in many different places and then I lose track of what I want to accomplish.  Today is a good day to get back in the habit of putting them on the blog.

I have lots of things I want to get done going around and around in my head.  Listing some here for me to track should help me narrow them down. Let's see what to put on the list? There is my quilt club challenge that is due Sept 5th so that's a given. Then I need to ramp up my sewing for the one craft show I do that is in November. There are birthday and Christmas presents to be made.  Holiday pillowcases.  Still have t-shirt pillowcases that haven't gotten done.  The embroidery quilt I'm not getting done very fast, ok I don't even know where the block is that I've been working on for three months.  Oh can't forget the labels I need to make and get sewn on to quilts. Then I wanted to do some rearranging in the sewing room this month while the sewing machines were at the sewing spa.  These are just the ones I can think of off the top. Who know what else will pop up during the month or what NewFo will be calling my name.  Darn I already feel so far behind and it's just the first day of August.

Here is my Get It Done List for August.

1. Charm quilt (this is the Quilt Club UFO Challenge)

2. Start on Fall and Holiday pillowcases Goal of 10 done in August

3. Make Labels and send out quilts

4. Make One tote bag

5. Trace blocks for embroidery quilt (find the first one too.)

Ok I think five set goals for August is good.  I've marked my calendar for a mid month check in on Aug 16th.

Ok August bring it on!

I'm linking up with Judy at Patchwork Times for Get It Done.