Monday, July 7, 2014

Summer Break 2014 Week 4

Summer Break Week Four just sort of flew by.  It was taken up with appointments and errands and then there was the 4th of July  too.  What a great week.

I took the chairs I finished last week into the shop, worked on my QOV string blocks.  Had an eye exam, yes I still need glasses for hand work.

[caption id="attachment_2775" align="aligncenter" width="225"]Red Chair Red Chair[/caption]

[caption id="attachment_2778" align="aligncenter" width="300"]Foot Stool Foot Stool[/caption]

Machine sewed binding on a QOV ready for the hand work, Usually my favorite part but it's been a tad bit warm for having a quilt on your lap here.  Time to break out the little table I have to rest it on.

[caption id="attachment_2798" align="aligncenter" width="300"]Binding for QOV Binding for QOV[/caption]

I made a pair of pillowcases for niece and blanket for nephew

SR27 4

[caption id="attachment_2785" align="aligncenter" width="300"]new blanket for J new blanket for J[/caption]

 

On my three summer projects.  I got 14 3 inch 9-patchs finished  and five more blocks for the 2" quilt.  No sets cut for the plus quilt.  I realized this week that I want to add some holiday fabric in to all three of these quilts and the timing is perfect since I'm pulling out my Halloween and Christmas fabric so I can at least pretend that I'm ahead of the game.  :)

[caption id="attachment_2796" align="aligncenter" width="300"]3in 9-patch 3in 9-patch[/caption]

[caption id="attachment_2797" align="aligncenter" width="300"]2in 9-patches 2in 9-patches[/caption]

SUMMER BLOCK COUNT

3" 9-Patches :   This Week:  14   Done: 261   Need about 400 I think

2" Quilt: Have:  This Week:  5    Done:  59

2.5" Plus quilt: Have 184 sets of 5 cut Need 97 more sets for a total of 281

2.5" Plus quilt: Have 10 sets of 4 cut. Need 21 more sets for a total of 31

That wraps it up for week 4.  I'm starting on a super secret project tomorrow morning.  I'll tell you all about it next week.

Have a good week and stay cool

 

Sunday, July 6, 2014

Stash Report Week 27, 2014

This week just flew by.  I think the second half of the year goes so much faster than the first half, maybe cause it's all down hill. :)

I did a bit of stash enhancement but to balance it out I did some de-stashing too.

On a short little trip to buy fabric for ONE pillowcase 10 yards of fabric found a new home

SR27 1

There is pillowcase fabric and the red in back is for the QOV I'm working on.

[caption id="attachment_2784" align="aligncenter" width="300"]Love these bottle caps Love these bottle caps[/caption]

Then my sister told me she needed to make baby blankets so this stack of flannel is on it's way to here.

SR27 5

I made a new drag-a-long blanket for my nephew

[caption id="attachment_2785" align="aligncenter" width="300"]new blanket for J new blanket for J[/caption]

Oh and I did make that pillowcase. I decided that it needs a mate so that's on the list for this evening.

SR27 4

So when all  the math is done I still have more fabric going out than in.  Which is a first for me at the half way point.

 

Added this week:  10.25 Yards
Added this Year: 101.75 Yards
Used and donated last week: 31 Yards
Used this Year: 148.75 Yards
Net Used this Year 47 Yards

For more stash reports head over to Judy's at Patchwork Times.

Have a great week and enjoy your summertime.

 

Monday, June 30, 2014

Summer Break 2014 Week 3

Well I made progress this week.

I worked in the yards: It really doesn't take much to fill up all the trash cans around here. :)

SB Week304

My cutting table went from this:

[caption id="attachment_2768" align="aligncenter" width="300"]Cutting table before Cutting table before[/caption]

 

To this on Monday, and really you can still see the surface today too.

[caption id="attachment_2769" align="aligncenter" width="300"]Cutting Table After Cutting Table After[/caption]

I tackled my "Mountain of Flannel"  now it is mostly contained in these bins.

[caption id="attachment_2761" align="aligncenter" width="225"]Mountain of Flannel Mountain of Flannel[/caption]

I finished up my String Star Centers and even trimmed up several to start my star block.  Yes I was doing it at the kitchen counter and yes I grabbed a bowl out of the cupboard above for the scraps. :)

[gallery ids="2774,2772"]

Also finished up some furniture.  How about this lovely little shin warmer chair. Is she cute or what.  While I was on the furniture roll I finished up this little storage footstool too.

[gallery ids="2779,2778,2775,2777,2776"]

I received some 2" charms from Deanna at Wedding Dress Blue for my 2-inch quilt which is her pattern Growing up Odd.  Still totally in love with this pattern and can't wait until fall when I have it all together.  I've fallen behind on my one block a day goal but made up many when I received her charms.  I just had to use them right away. Of course

[gallery ids="2770,2773"]

I'm cutting squares and sewing blocks as I work through my scrap bins

Here is my block count for my three summer projects

3" 9-Patches :  Have 247  Need about 400 I think

2" Quilt:  Have: 54   Need 17 to be caught up to July 1st

2.5" Plus quilt:  Have 184 sets of 5 cut  Need 97 more sets for a total of 281

2.5" Plus quilt: Have 10 sets of 4 cut.  Need 21 more sets for a total of 31

Sunday, June 29, 2014

Stash Report Week 26, 2014

Half way through the year and I'm ahead of the fabric.....that is a good thing. :)

I had some time to work on the sewing room and fabric this week. I spent some time sorting through the mountain of flannel. It's still a mountain just not as tall as McKinley anymore.  The yardage is now contained, well almost  in six bins and the scraps and small pieces are in one bin, ok one and a half  for sorting later this month summer, those are the clear bins setting on the side.   The blue bin on the top has flannel that has been pulled for projects and either cut or started.   I put the current sewing projects in bags for the summer  (so I don't lose them) while I tackle the sewing room.

Yikes that sounds more like NINE bins, cause they all are full of flannel.  I think it's past time for a sew-in at the Brick Sidewalk.

[caption id="attachment_2761" align="aligncenter" width="225"]Mountain of Flannel Mountain of Flannel[/caption]

 

Overall I'm happy with where I am with my stash numbers for half way thru the year.

Here are this weeks numbers:

Added since last report:  0 Yards
Added this Year: 91.50 Yards
Used and donated since last report: 24.50 Yards
Used this Year: 117.75 Yards
Net Used this Year  26.25

 

For more stash reports head over to Judy's Patchwork Times.

 

Monday, June 23, 2014

Summer Break Week 2

Week two of summer break and no finishes sure hope it won't be like this all summer.  So just what did get worked on this week?

There was some painting. I changed color in mid painting of the chairs and this is the vintage fabric I'm using on the seats.

[gallery ids="2738,2739,2740,2741,2742"]

We welcomed a new old sewing machine to the fold.  She came with her own cabinet. A singer 201

[gallery ids="2747,2749"]

We did some cleaning out, yes this part of the house still has original 1960's avocado green carpet. This is not the permanent home for the new machine.

SB Week2 1a

I started in on the guest room.  Can you believe there were still Halloween and Christmas pillowcases and table runners on the bed from last fall.  It's no wonder we don't get many guest. I think they're afraid they'll have to sleep on the floor for all the fabric on the bed.  Not really Sister, you can come anytime.

SB Week2 13

Mr Bill took apart an old pump organ.  Before you feel too bad it was in really bad shape and we saved the good pieces and carved pieces to repurpose.

[gallery columns="2" ids="2743,2744,2745,2746"]

Tuesday was QOV sew day.  We were making string blocks ala Al Lind.  I have a few many to go for my quilt top.  But I sure do like string quilts.  Here is the link to the pattern on the Quilts Of Valor site

This summer I'm trying to get the sewing room back in order and get all the donated scraps under control. Some times I have a hard time cutting up the larger scraps, cause wonder if I need a 4 inch block and I cut it all down to 2.5 in.  Really sometimes I can drive myself crazy.  Well not this summer it's all getting cut down to usable sizes and this fall I'll have a empty "scraps to cut down" bin (or two).

So with that in mind I'm cutting 2.5 in and 1.5 in squares in sets of five.  The 2.5 in for a plus quilt that I'm starting in the fall, as of this morning I only need 100 more sets, no matching sets for this one.  The 1.5in is for nine patch blocks I started last July as my leader/ender and I'm ready to finish it up too....But I need lots more for the layout I'm thinking so it has moved from leader/ender to summer project.

[caption id="attachment_2751" align="aligncenter" width="300"]Sweet little 9 patches that will finish at 3in Sweet little 9 patches that will finish at 3in[/caption]

Then there is the 2in quilt.  The one I was going to make one block a day quilt.  Well I'm only 13 days behind.  I'm thinking Wednesday night will be 2in nine patch marathon so I can get a few days ahead. I wrote about it here.

[caption id="attachment_2752" align="aligncenter" width="300"]2 in quilt 2 in quilt[/caption]

So that is how Week 2 went. Not so exciting yet but there's always hope.

Till next week.

 

 

 

Monday, June 16, 2014

Summer Break 2014 Week 1

And just what did I get checked off my impossible long list.  Well not a gosh darn thing.  I've started on things but no finishes for the first week.

First there was the furniture.  Doing the prep work always takes the longest

[gallery ids="2719,2720,2721,2724,2725"]

I did make a cover for Mr. Bills computer while getting acquainted with my new featherweight.

SB Week1 04

The dirt piles that have been showing up got moved and spread around.  Mr. Bill got to do his favorite job of "water boy "  and look there was a bonus in the piles of dirt.  Big granite rocks, we like big rocks here.

[gallery ids="2726,2727,2728,2729,2730"]

Then I pulled this quilt top out of cold storage..well you know what I mean. You might remember that it was just last summer that I was finishing it up.  I really was not happy with the way it turned out so it got put away to rest.  I think I'm ready to try again to get this one off the UFO list.

[caption id="attachment_2723" align="aligncenter" width="225"]Charm Quilt Top Charm Quilt Top[/caption]

Time was also spent cutting up scraps, eye appointments and trips looking for paint and to Home Depot.

I did some cleaning too and found the top of my buffet.  Now that impressed Mr. Bill.

[caption id="attachment_2731" align="aligncenter" width="300"]Buffet Buffet[/caption]

Not too bad for the first week of summer after all I don't want to get it all done in one week.  :)

Sunday, June 15, 2014

Stash Report Week 24, 2014

I'm  happy to say that I used fabric this week that I can count out.  I'm super happy to say that I had no fabric coming in.

Yes that's right I used a whopping three quarters of a yard for a pillow back.  I like to write it out like that cause is seems like so much more..right?  It was a big pillow.

[caption id="attachment_2710" align="aligncenter" width="225"]Feed Sack Pillow Feed Sack Pillow[/caption]

 

This was my first flap back pillow so I made the back pieces different on purpose cause I knew they would not match up. That's a skill I may or may not work on. :0)

[caption id="attachment_2711" align="aligncenter" width="225"]Ticking Back Ticking Back[/caption]

 

Added last week : 00 Yards
Added this Year: 91.50 Yards
Used last week: .75 Yards
Used this Year: 93.25 Yards
Net Used this Year 1..75 Yards

To more stash reports head over to Judy's Patchwork times