Showing posts with label quiltathon. Show all posts
Showing posts with label quiltathon. Show all posts

Sunday, January 13, 2013

Stash Report - Week 2, 2013

Stash Report   Quiltathon Update   100 Post Give-A-Way


As you can see this post is covering a lot this week cause there's just so much going on.


Stash Report: 


Week 2 and I'm in the red already.  This should not be too big of a surprise since I was already in the red last week just not as deep. :)

[caption id="attachment_1656" align="aligncenter" width="300"]For Pillowcases For Pillowcases[/caption]

I picked up some cute Valentine fabric for pillowcases.  Then just fell in love with the yellow and purple buffalo plaids, these will be pillowcases for us.

[caption id="attachment_1657" align="aligncenter" width="300"]yummy flannel yummy flannel[/caption]

 

Now that I think about it Mr. Bill is partly to blame, yep he is.  See it's like this.  I bought some cute Peanuts fabric to make a pillowcase (did you see that "A" as in one). Then he says that would make a cute quilt and you should make a pair of pillowcases.  So what was I to do but head back to the store and buy more!!

[caption id="attachment_1655" align="aligncenter" width="300"]quilt, pillowcases quilt, pillowcases[/caption]

The purple and green are for pillowcases for a bridal shower.

I have been cutting and sewing but I've only finished one table runner  so that was all I could count this week. I'd like to tell you that it will be different next week but I'm setting here with my Connecting Threads Catalog.

[caption id="attachment_1658" align="aligncenter" width="199"]Valentine Tablerunner Valentine Tablerunner[/caption]

So here are my final numbers for this week

  • Added this week: 32.25

  • Added this year:  36.25

  • Used this week:  1.00

  • Used this year:  1.50

  • Net 2012  -34.75        


Quiltathon:

My quiltathon update.  I got about 3 hours of sewing on Thursday afternoon and then I got up early this morning and sewed for another hour.  I got all the rows on my QOV sewn together and the Peanuts quilt top done.  I'll have pictures for tomorrows design wall if I can find my camera in this black hole we call home. :)

100th Post Give-A-Way: 

This is my 100th post.  I know to some that doesn't sound like much but for me that's alot, when some people thought I would last a week but it's been a year  and 100 post.  To celebrate I'm having a give away. These five batik fat quarters.

[caption id="attachment_1660" align="aligncenter" width="300"]Pastel Batiks Pastel Batiks[/caption]

Just leave a comment, you can tell me how many post you've written or just say hi. On Wednesday my random number picker (Mr. Bill) will pick  a number.

To see more stash reports head over to Patchwork Times.

Saturday, November 17, 2012

November Quiltathon Part 2

WooHoo!  I got the linen closet done and moved on to the sewing room.

I'm very lucky to have a large walk-in linen closet.  Last fall we put new carpet in the hallway and the closet.  I really cleaned out the closet and organized all the shelves. This  week I wanted to make room to store the  model trains while we are working on the main floor of the house and redoing the master bedroom.

Here is the master bedroom today.   But that's another story. :)



The extra cars, track and engines needed to be put some place safe, out of the way of the work we are getting ready to do.

In the linen closet are the train cars, extra track, the HO sets, and the extras that go along with running a railroad. I also store my batting and one sewing machine rolling case there.



In the guest bedroom closet  the engines and the big cars are hanging out with my upholstery fabric.



 

I did get to the sewing room too.  First a took a seven seam sewing break.  I had this mug rug laid out and didn't want to forget the order so I just sewed it up real quick.



Then I tackled my cutting table and that back corner.





I put away the fabric that was on the chair and the table.  Sorted through the piles behind the chair too.



What's left on the table is two wall hangings and a quilt that need to be trimmed and binding done, pillowcase parts that have been cut and need sewn and my soap quilt.  I got the chair and corner done but the sewing table still needs sorted out.



This will be it for my November Quiltathon. Today we're going for a drive and Sunday I work.

Happy Weekend.

 

 

Friday, November 16, 2012

November Quiltathon, Maybe

Really I was going to do this months quiltathon over at Judy's Patchwork times. I was all ready to do some sewing just for me.   Reality crept up on me and so far I've had a 20 minute-athon. (I just made that up).  Today was the day I'd planned to close the door and sew....but....I started cleaning out the hall linen closet earlier this week and I need to finish that first.  Not just because everything that got pulled out of the closet is in the hall sort of blocking the door to my sewing room.

Then there is the sewing room, four weeks of power sewing for a craft faire says it all.  So my quiltathon time should be spent trying to find the top of my cutting table, my chair, and floor.   Or I could just clear a path between the sewing machine and ironing board?

What do you think clean or sew, I know tough choice. :)

I let you know how it goes.  LOL