I took the chairs I finished last week into the shop, worked on my QOV string blocks. Had an eye exam, yes I still need glasses for hand work.
[caption id="attachment_2775" align="aligncenter" width="225"]
[caption id="attachment_2778" align="aligncenter" width="300"]
Machine sewed binding on a QOV ready for the hand work, Usually my favorite part but it's been a tad bit warm for having a quilt on your lap here. Time to break out the little table I have to rest it on.
[caption id="attachment_2798" align="aligncenter" width="300"]
I made a pair of pillowcases for niece and blanket for nephew
[caption id="attachment_2785" align="aligncenter" width="300"]
On my three summer projects. I got 14 3 inch 9-patchs finished and five more blocks for the 2" quilt. No sets cut for the plus quilt. I realized this week that I want to add some holiday fabric in to all three of these quilts and the timing is perfect since I'm pulling out my Halloween and Christmas fabric so I can at least pretend that I'm ahead of the game. :)
[caption id="attachment_2796" align="aligncenter" width="300"]
[caption id="attachment_2797" align="aligncenter" width="300"]
SUMMER BLOCK COUNT
3" 9-Patches : This Week: 14 Done: 261 Need about 400 I think
2" Quilt: Have: This Week: 5 Done: 59
2.5" Plus quilt: Have 184 sets of 5 cut Need 97 more sets for a total of 281
2.5" Plus quilt: Have 10 sets of 4 cut. Need 21 more sets for a total of 31
That wraps it up for week 4. I'm starting on a super secret project tomorrow morning. I'll tell you all about it next week.
Have a good week and stay cool